Document metadata
- Status
- Maintained
- Approval
- Approved
- Version
- 1.0
- Classification
- PUBLIC
- Owner
- Lightning IT Documentation Maintainers
- Approver
- Lightning IT Product Owners
- Audience
- product and delivery owners, documentation reviewers, customers and technical reviewers
- Last reviewed
- Next review
- (Annual)
Acceptance and publication
Acceptance is generation- and scope-specific. The AIO brand or the presence of automation content does not prove that a particular capability, target, integration, or operating result has been delivered.
Delivery acceptance
A concrete AIO delivery needs an explicit record of:
- product generation and version;
- target environment and included automation scope;
- prerequisites, responsibilities, and exclusions;
- supported systems and interfaces;
- security, authorization, credential, and evidence handling;
- tests, expected results, and acceptance criteria;
- documentation, handover, support, and lifecycle terms; and
- observed results, limitations, findings, and authorized acceptance.
Missing evidence remains a gap. Acceptance applies only to the agreed scope and does not establish blanket compatibility, compliance, security, or future performance.
Public documentation acceptance
Publication is a separate decision from delivery acceptance. An AIO page under
docs.l-it.io is accepted only after:
- each material claim is traced to an authority approved for that publication context;
- protected customer, operational, infrastructure, and commercial information is excluded;
- the exact documentation-tree digest receives role-authorized approval;
- the reviewed revision passes repository, preview, accessibility, search, link, and security checks;
- the protected merge and deployment complete; and
- the public route is verified against the accepted commit.
The canonical product authority, LIT-PRD-60-AIO version 14, authorizes the
https://docs.l-it.io/aio/ route family and the initial
https://docs.l-it.io/aio/overview/ route. This source authorization does not
replace exact-tree approval evidence or any production control required before
publication.